Pages

Friday, December 30, 2011

The Room

After tearing out the old layout this past summer, construction started on this current one. Here are some progress pictures to get everybody up dated with what has been done.

Wednesday, December 28, 2011

Trackplan

Here is a trackplan I've come up with:

History of the layout

This layout is based on the FWWR's Everman Job. This job originates from Hodge Yard in Ft Worth, TX and proceds to the Everman Industrial Park, a route of approx 15 to 20 miles.

It starts at Hodge Yard:
http://binged.it/tUExv2
Leaves the yard on either FWWR tracks or cross's over to UP tracks and heads southbound to Tower 60 depending on availability at the time.
http://binged.it/rXcGcu
Heads Southbound to Tower 55. At Tower 55 takes east leg on UP tracks.
http://binged.it/vYXghY
Turns southbounnd again on FWWR tracks and heads to the Everman Industrial Park.
http://binged.it/tEWFNJ

Tuesday, December 27, 2011

And it begins

This is my first of hopfully many posting of my progress of the construction of my model railroad.